CHECKLIST

What to include

  1. 01Panel access and labels
  2. 02Visible enclosure damage
  3. 03Temporary power arrangements
  4. 04Leads and extension cords
  5. 05Socket and switch condition
  6. 06Wet-area exposure
  7. 07Equipment isolation
  8. 08Warning signs and barriers
  9. 09Photo evidence
  10. 10Immediate escalation and owner

FIELD WORKFLOW

How to use this template

  1. 1

    Create one report for the property, project, inspection, or walkthrough.

  2. 2

    Record each finding by area with priority, status, owner, due date, and notes.

  3. 3

    Attach clear evidence photos and mark up the exact defect when useful.

  4. 4

    Review missing information, collect sign-off, and export the handoff package.

BEFORE YOU START

Adapt it to the job

Names, inspection frequency, acceptance criteria, retention rules, and sign-off responsibilities vary by project and jurisdiction. Remove irrelevant items and add the exact standards, drawings, specifications, and responsible people that apply to your work.

Do not open energized equipment or perform electrical testing unless trained, authorized, and properly equipped.